The Construction Specialists



Partial removal of side of house, temporary boarding to maintain living accommodation during building works.

On the ground floor the new extension consisted of a utility room and kitchen with bi-fold doors to the patio. It featured a local purpose made Oak entrance door.
A new staircase led to the first floor wihch featured two new en-suite bedrooms and a family bathroom.
The master bedroom suite was equipped with an en suite bathroom and a dressing room with sliding mirrored doors.